The amount of the security shall not be less than five percent (5%) of the Bidder’s total price indicated in the Bid Proposal Form. No bid may be withdrawn for a period of ninety (90) days after the scheduled closing date for the receipt of bids, except as otherwise provided in the Instructions to Bidders and Terms and Conditions.īids must be accompanied by Bid Security. Failure to attend the mandatory pre-Bid meeting may result in rejection of your bid. Representatives of the Owner and Engineer will be present to discuss the project. on Wednesday, Februat the North Palm Beach Public Works Department, 645 Prosperity Farms Road, North Palm Beach, FL 33408. Highway One, North Palm Beach, Florida 33408 or on the Village’s website: A mandatory pre-Bid meeting is scheduled for 10:00 A.M. The Invitation to Bid is open to inspection and may be obtained at Village Hall, 501 U.S. All bids will be publicly opened and read aloud in the Village Hall Conference Room. Any bids received after the time specified will not be accepted and shall be returned unopened to the Bidder. Highway One, North Palm Beach, Florida 33408 until 2:15 P.M. Sealed bids (one original and three copies) will be received by the Village Clerk’s Office at 501 U.S. The waterway under the bridge is closed until all the sidewalk and pedestrian barriers are removed and the concrete slab is removed from the channel.The Village of North Palm Beach will be receiving sealed bids for the Earman River Transfer Pump Station. If removal of the sidewalk and pedestrian barrier is not completed by Monday morning, the work will resume with the bridge closed to all traffic Monday night beginning at 8 p.m. The city has set up traffic detours which can be viewed here.Įmergency response vehicles will still have access to the bridge, according to the city. “We just hope its safe after this,” said Allison. While there is concern about construction driving away business, the restaurant understands the repairs are necessary. “It’s going to actually take us probably another 15 minutes to just get somewhere and back." “We’re hoping that this is going to be the only weekend that we really have to worry about it,” said Joceilie Allison, manager at Allora Pizza and Pasta located just north of the bridge.Īt Allora, they’re concerned the project could cut into pizza profits. Over the weekend workers will remove the remaining sidewalk and pedestrian barrier wall from both sides of the bridge, the city said. The department is working to determine the best long-term options for replacing the sidewalk. "The other remaining rod in that span could not hold the weight of the sidewalk and also broke which resulted in the portion of sidewalk falling into the canal below," according to the statement from FDOT. One of the steel rods in the outside concrete panel of span 2 corroded and broke, the Florida Department of Transportation reported Friday afternoon. 30, according to the city.Ī railing and a portion of the bridge collapsed last week. 1 Bridge over the Earman River in North Palm Beach is scheduled to be closed 8 p.m.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |